top of page
MESSAGE FROM ARCHISCALE
Hi Buddy Refer to Working Drawings. Few things I still need to add but can do that after the Engineering and building surveyor RFI.
Need your attention with measurements regards the hoist area and roller door access, measurements did change because of the setback from the portal frame and wall thickness.
Let me know what you think otherwise it's ready for Engineering and get preliminary drawings so I can overlay them.
Anna will chase the rest from you like soil test or anything building surveyor requests.
bottom of page